Case study - New plant construction in a fossil-fueled power plant

Transport systems for wet ash, fly ash and FGD gypsum
Installation location

Mannheim, Germany

Challenge

New plant construction in Block 9 of the large Mannheim power plant

Conveyed material

Ash, gypsum

Construction phases

2009 to 2014

Modules

Dry ash loading system and ash moistening system

Special features

Planning, manufacturing and delivery of complete conveyor systems as well as assembly and commissioning on site

Case study

Special systems for gypsum and ash transport

The gypsum produced during desulphurization is loaded onto ships using special conveyor belts, an intermediate stockpile with a portal scraper and a ship loader. Wet ash as well as dry or moistened fly ash are also shipped via the ship loader on the waterway.