Case study - port handling and gypsum storage in the Netherlands

Transport units for ashes and FGD gypsum transport
Installation location

Eemshaven, Netherlands

Fuel

Hard coal and biomass

Power plant output

1.560 MW

Conversion year

2006 to 2015

Modules

Complete combustion chamber ash disposal system, various reversible and movable belt conveyors, components, semi-portal scrapers, loading silos, ship loaders, electrics

Special features

Design, calculation, construction, manufacture, assembly in the company's own facilities, tests, commissioning, complete documentation, training of operating personnel, trial operation, combustion chamber ash disposal

Case study

fossil-fired power plant with biomass firing

The transport system from the gypsum preparation (after filter belt presses) to the gypsum warehouse is designed for a conveying capacity of 100 t / h, and for the transport from the gypsum warehouse to ship loading of 400 t / h.

All belt conveyors are set up in closed belt bridges and are easily accessible. Safety devices such as belt misalignment monitors, speed monitors and pull rope switches monitor the correct function.

The gypsum is temporarily stored in a warehouse; both storage and retrieval are carried out using a semi-portal scraper installed in the warehouse.